A good bid covers every cost of the job, a fair share of the business's overhead, a cushion for surprises, and still leaves the profit you meant to earn. Enter your estimated hours, your loaded labor rate, materials and other direct costs, then set contingency, overhead and a target margin. You get the bid price, your break-even number and the profit it produces.

Step 1

Enter your numbers

Direct costs

Your burdened cost per crew-hour, not the bill rate.

Include tax and delivery.

Optional
Pricing
Optional

Cushion for unknowns, applied to direct costs.

Office, insurance, vehicles and admin as a share of job cost.

Profit as a share of the bid price.

Results update as you type. Nothing you enter leaves your device.

Live calculation

Results

Bid price

$7,647.50

Profit

$764.75

Break-even costdirect + contingency + overhead
$6,882.75
Direct job cost
$5,700.00
Labor cost
$2,200.00
Contingency
$285.00
Overhead
$897.75
Markup on break-even
11.11%
Bid per labor houruseful for sanity-checking against your usual rate
$191.19
  • A 10% margin is a 11.1% markup on your break-even cost — margin and markup are different numbers.
Next calculationBreak-Even Revenue CalculatorCheck the sales volume your overhead needs.

Estimates only. Verify important figures against your own records before acting on them. See our disclaimer.

How to use the Job Bid Calculator

  1. Estimate labor hours and your loaded labor cost per hour.
  2. Add materials, plus equipment, subcontractors and permits.
  3. Set contingency, overhead and your target profit margin to get the bid price.

Quick answers

How do I price a construction job?
Add direct costs (labor, materials, equipment, subs), add contingency and overhead, then divide by (1 − target margin) so the margin is measured on the price.

Edge cases and limits

  • Dividing by (1 − margin) is not the same as adding the margin percentage to cost — the second underprices.
  • After the job, check the real numbers in the Job Profit Calculator.

What this calculator includes

What you enter

  • Estimated labor hours
  • Labor cost per hour
  • Materials
  • Equipment, subs & permits (optional)
  • Contingency (optional)
  • Overhead
  • Target profit margin

What you get back

  • Bid price
  • Profit
  • Break-even cost
  • Direct job cost
  • Labor cost
  • Contingency
  • Overhead
  • Markup on break-even
  • Bid per labor hour

How this calculation works

The bid is built from the bottom up: direct costs first, then a contingency cushion, then overhead, and finally profit priced as a margin of the selling price so the percentage you set is the percentage you keep.

  • Labor = hours × labor cost per hour
  • Direct cost = labor + materials + equipment/subs/permits
  • Contingency = direct cost × contingency %
  • Overhead = (direct cost + contingency) × overhead %
  • Break-even = direct cost + contingency + overhead
  • Bid price = break-even ÷ (1 − target margin %)

Worked example

A deck job needs 40 crew-hours at a $55 loaded rate, $3,000 of materials and $500 of permits and rentals. The contractor uses 5% contingency, 15% overhead and wants a 10% margin.

  1. 1Labor = 40 × $55 = $2,200. Direct cost = $2,200 + $3,000 + $500 = $5,700.
  2. 2Contingency = $5,700 × 5% = $285, giving $5,985.
  3. 3Overhead = $5,985 × 15% = $897.75, so break-even is $6,882.75.
  4. 4Bid = $6,882.75 ÷ 0.90 = $7,647.50, leaving $764.75 of profit — a true 10% of the price.

Frequently asked questions

How do I calculate a price for a job?
Add up labor, materials and other direct costs, add a contingency for unknowns and your overhead share, then divide by (1 − your target margin). That last step is what makes the profit percentage hold up on the final price.
Why divide by (1 − margin) instead of adding a percentage?
Adding 10% to cost gives a 9.1% margin, not 10%. Dividing by 0.90 produces a price where profit is exactly 10% of what the customer pays.
What labor rate should I enter?
Your fully loaded cost per hour — wage plus payroll taxes, workers comp and benefits — not the rate you bill. The Labor Burden Calculator works that out.
How much overhead should I add?
Divide last year's overhead (rent, insurance, vehicles, office staff, software) by last year's direct job costs. That ratio is a far better number than a rule of thumb.
What is a reasonable contingency?
It depends on how well-defined the job is. Clear scopes on familiar work need little; remodels with hidden conditions need more. Keep contingency separate from profit so you can see what you are really charging for risk.
Is this the same as a construction estimate?
It is the pricing step. It assumes you already know the quantities and hours; the Construction Material Quantity and Concrete calculators help with the takeoff.

Disclaimer

This calculator returns estimates based only on the values you enter. It does not account for taxes, financing terms, local regulations, or conditions specific to your operation, and it is not accounting, legal, tax, or investment advice. Confirm any figure that carries real cost before you rely on it.

Calculations run entirely in your browser and the numbers you type are never sent to us or stored. Read how Answerivo calculators are built or report a correction. About Answerivo.